From bare land to busbar — or any scope in between

Tomris is primarily a distributor — ENERGIN equipment delivered DDP is the core of every deal. The rest is optional: install it yourself, or have us take any share of the work, up to a full turnkey plant. You choose the scope; we carry the responsibility for it.

Four ways to buy

Pick your scope

Equipment — DDP

We procure directly from the RSE factory and deliver DDP (Incoterms® 2020): export packing, ocean/land freight, customs clearance, import duties — all handled, all in one price. The unit arrives at your gate ready to set.

Supply + Installation

We deliver, offload, rig and set the units, make mechanical and electrical connections, and commission with factory support — you provide the prepared site.

Full turnkey / EPC

We take bare land: civil works and concrete pad, electrical runs to the containerized RSE units, gas piping, heat interconnects, switchgear, grid tie, commissioning, handover.

Operate & Maintain

After handover, hour-based maintenance contracts keep the plant at factory spec — parts, service, and support from one source.

Open 40 ft container with ENERGIN genset
Arrives DDP: genset, piped and wired, in its container
Inside a containerized ENERGIN unit
Inside the container — set it, cable it, run it
Containerized power plant on a gas field
Field plant on associated gas — pad, units, pipework by Tomris
Full build-out scope

What "turnkey" includes

  • Site & civil: survey, grading, concrete pad design and construction sized for the genset or containerized plant.
  • Electrical: LV/MV runs from the RSE units to your switchgear, protection coordination, paralleling, grid interconnection.
  • Mechanical: fuel gas piping and pressure regulation, exhaust routing, heat-recovery piping to your process or district loop.
  • Controls: ENERSCREEN integration with your SCADA/BMS, remote monitoring setup.
  • Commissioning: factory-supported startup, performance verification, operator training, documentation handover.
Why DDP

One price. Zero surprises.

Under DDP, Tomris bears cost and risk until the equipment is delivered to your named place — cleared for import, duties paid.

  • No freight forwarder to hire, no customs broker to manage.
  • No exposure to duty changes or clearance delays — that's our risk, not yours.
  • Budget certainty: the landed price on the quote is the landed price you pay.
  • Units ship as standardized, pre-packaged modules in the packaging you specify — open skid, sound-attenuating enclosure, or 40 ft container (up to 1 MW inside, with or without sound enclosure).
  • Fast factory turns: from 12 weeks to 12 months depending on order size — while much of the industry quotes multi-year backlogs.
Why it works

One factory behind everything we install

Because RSE builds the engine, the genset, the CHP package, and the controls in-house, Tomris installs equipment with no third-party interfaces inside the machine. Less guesswork during design. Fewer surprises during commissioning. And a single factory warranty covering the whole unit after handover.

Pre-packaged modules

Units arrive fully packaged with pre-manufactured radiator piping — installation measured in days, not months.

No overhead cranes

500 kW building blocks can be handled by forklift and set on simple foundations — dramatically cheaper civil works than large single engines.

Factory-supported startup

Commissioning follows RSE factory procedures, with the manufacturer as direct technical contact — not a packager pointing at suppliers.

Define your scope — get a fixed proposal

Tell us where the site is and where you want responsibility to change hands.